Skip to content
propertyjasoos.in

Talk to an advisor +91 98765 43210

Now covering Bengaluru, Hyderabad, Pune

Property News

PNB and Bank of Baroda Home Loan Rate Hike, Patna’s New Market Plan and a Tech Park for Gardanibagh

PNB and Bank of Baroda home loan rate hike is live from 8 October, Patna's New Market gets a Rs 590 crore plan, and Gardanibagh is picked for a tech park.

PropertyJasoos: PNB and Bank of Baroda Home Loan Rate Hike, Patna's New Market Plan and a Tech Park for Gardanibagh
In this guide
  1. 1. PNB and Bank of Baroda have also raised loan rates, from 8 October
  2. 2. Patna New Market: a ₹590 crore mall and vendor market plan near Patna Junction
  3. 3. Gardanibagh picked for Bihar’s first tech park
  4. Buyer checklist for this week
  5. Sources

We are detectives for property, and we share what we investigate. Yesterday we followed the RBI hike into SBI. Today we check the two other public banks many Patna buyers use, and look at two projects that could change demand around Patna Junction and Gardanibagh.


1. PNB and Bank of Baroda have also raised loan rates, from 8 October

Bank of Baroda branch with ATM signboard on an Indian street
Photo: Bank of Baroda by joegoauk73, CC BY-SA 2.0

After the RBI raised the repo rate from 5.25% to 5.50% on 7 October, both banks moved their repo-linked rates up by the same 0.25%, a week before SBI did.

  • Bank of Baroda: the Baroda Repo Based Lending Rate (BRLLR) went from 7.90% to 8.15%, effective 8 October 2026. The bank’s mark-up stays at 2.65%. The bank informed the stock exchanges under SEBI’s disclosure rules. (PSU Connect, 7 Oct 2026)
  • Punjab National Bank: the Repo Linked Lending Rate (RLLR) went from 8.10% to 8.35%, effective 8 October 2026. This includes a 0.35% business strategy premium. PNB kept its MCLR and base rate unchanged. (PSU Connect)

These benchmarks are the floor. Your actual loan rate is the benchmark plus a spread set by the bank based on your credit profile.

What it means in rupees, using our own calculation: on a ₹50 lakh loan over 20 years, going from 8.25% to 8.50% raises the EMI from about ₹42,603 to about ₹43,391, roughly ₹788 more per month.

🔍 Jasoos take: If your loan is with PNB or Bank of Baroda and is repo-linked, the new rate will apply at your next reset. Note that PNB did not move its MCLR, so an older MCLR-linked loan may not change this month. Ask your branch in writing which benchmark your loan follows and whether the hike raises your EMI or stretches your tenure. If you are still choosing a lender for an under-construction flat, compare the total rate (benchmark plus spread) across SBI, PNB and Bank of Baroda on the same day, since all three have now moved.


2. Patna New Market: a ₹590 crore mall and vendor market plan near Patna Junction

Busy market street in Patna with cycle rickshaws and shops
Photo: Patna Street by eekim, CC BY 2.0

The Union Housing and Urban Affairs Ministry has approved a ₹590.05 crore plan to redevelop the New Market area near Patna Junction, according to Patna Press. It reports the project as the first in Bihar approved under the Centre’s Urban Challenge Fund. (Patna Press, 15 Oct 2026)

  • What is planned: a seven-storey “Patna Mall” between the mosque and the GPO roundabout, and a three-storey vendor market between Mahavir Mandir and the mosque. The mall would have two basement parking levels, shops on the lower floors, a multiplex, food court, offices and a hotel above.
  • Size: about 39,990 sq m for the mall and 4,600 sq m for the vendor market, with 15,694 sq m set aside for parking.
  • Money: 50% from market-based sources, 25% from the Bihar government and 25% from the Centre, on a PPP model.
  • Timeline: construction targeted to start in 2027, with completion planned within three years.
  • Open questions: about 400 existing shops would need to be demolished, and the report says arrangements for current shopkeepers “have not yet been detailed.”

A Prabhat Khabar report describes a 16-storey New Market hub at the same spot, so the final design may still change. (Prabhat Khabar)

🔍 Jasoos take: New Market sits in the city’s oldest commercial core, and a project like this mostly affects shops and offices, not flats. For homebuyers near Patna Junction, Bakarganj or Fraser Road, the honest picture is several years of demolition and construction traffic first, with any benefit after 2030. If a seller uses “New Market mall” to justify a higher price today, remember construction has not even started.


3. Gardanibagh picked for Bihar’s first tech park

Aerial view of Patna city with buildings and green open spaces
Photo: Aerial view, Patna by Scorius, CC BY 2.0

On 12 October the Bihar cabinet, chaired by Chief Minister Samrat Choudhary, approved an MoU with NBCC (India) Ltd to develop the state’s first technology park in Gardanibagh, Patna. NBCC was chosen on a nomination basis. (Patna Press, 12 Oct 2026)

  • The state’s IT Department expects the park to attract more than 100 companies and create over 5,000 direct jobs in IT, IT-enabled services and electronics design and manufacturing.
  • It is linked to the Bihar IT Policy 2024 and the Bihar Global Capability Centres Policy 2026.
  • The report gives no land area, exact site, cost or timeline. On X, readers replying to the news asked the same questions. (Bihar Infra Tales on X)

🔍 Jasoos take: Office jobs nearby can lift rental demand for flats in areas like Gardanibagh, Anisabad and Phulwari Sharif, but only once offices are built and filled. Right now this is a cabinet approval and an MoU, with no site plan or date. Treat any “near the IT park” pitch as a long-term maybe, and ask the seller to show you the exact location on a government document.


Buyer checklist for this week

  • PNB and Bank of Baroda borrowers: ask in writing which benchmark your loan follows and when it resets.
  • Choosing a lender: compare benchmark plus spread from at least three banks on the same day.
  • Near Patna Junction: price in years of construction before any New Market benefit.
  • “IT park” or “mall nearby” pitches: ask for the official site plan and start date.

Sources

Make the next step evidence-led

Reading about property is useful. Checking yours is better.

Investigate the facts behind a property, then compare the options that deserve your shortlist.

Investigate a property Compare properties